Blog Archive

Friday, September 11, 2009

New Driveway

The existing driveway was asphalt and the walkway was made of textured stone. Time had taken it's toll and replacement was needed.






The old drive was removed and the site prepared






The first cement truck arrives



The walk is poured and the driveway is underway




The cement is broom finished and is hardening.










The final step was to put stress relief cuts in the drive and walk












There are three guarentees with concrete:
1. It will crack somewhere.
2. It will hard hard.
3. It will never be stolen.


All the pictures can be seen at:
http://picasaweb.google.com/jackbarbic/Driveway#

No comments:

Post a Comment